Distillerie Mazzari S.p.A.- Sant’Agata sul Santerno (Ravenna)
Construction of a new sludge dewatering plant, due to the new necessity of depositing sludge deriving from the anaerobic treatment of distillery.
The plant is composed by three belt presses for a maximum flow of 38mc / h, fed from the liquid mud coming from the existing flotation plant.
With this type of project have been faced and scaled several environmental problems closely linked to mud: dust, odors, noise, storage and disposal.TECHNICAL DATA
TREE BELT CARRYING CAPACITY: 38 mc/h -
Hera – Rimini
Design for the renovation of an anaerobic digestion plant located in S.Giustina, Rimini.For the treatment of the civil sewage water it is active the purifier of Santa Giustina, in service for the area of Rimini, for six municipalities in the province, and for the Republic of San Marino.The waste water goes through the sewers and is lifted to the plant, where you have the purification, and then the water is placed back to the environment through a surface watercourse.
TECHNICAL DATA
CAPACITY: 400.000 inhabitants
MEDIUM SLUDGE INPUT FLOW TO THE DIGESTER: 630 m3/d
BIOGAS PRODUCED: 220 m3/h