Cades Pendes – Barcelona – Spain
Implementation of the executive project for the construction of a plant for electricity production from biogas in the area of Barcelona, Spain. The stillage to be purified, discharged from production plants (distillation plants of the marc, wine lees) are conveyed by means of special internal and sewer pipes in a collection tank. From there they are sent through to a lung stillage pumping station near the digesters. The stillage is then taken from the tank by means of pumps and sent to the plant for the treatment.
TECHNICAL DATA
ELECTRIC POWER: 700 kWe
INPUT: distillery stillage
BIOGAS PRODUCTION: 350 Nmc/h
YEAR: 2004